System shines in testing at lighting specialist
Martech UK, which designs and manufactures a wide range of energy efficient light fittings, has improved its electrical safety testing procedure by installing an automatic system provided by the advanced HAL 104 from Clare.
At its factory in West Yorkshire, Martech has been using ten HAL 104s on stock, assembly and sub-assembly production lines to test upwards of 600 units which it manufactures daily.
There, the HAL 104s perform a range of Class I, II and III tests to ensure compliance with EN 60598 and guarantee product quality, performance and reliability, including earth continuity, insulation resistance test and light-up/load test.
Function testing is also undertaken as part of a production line programme to check that units switch on/off and light correctly and that any ancillary equipment works in accordance with stringent performance criteria.
Seaward
0191 586 3511
Recommended Reading

Are building operators owning their systems – or just renting access?
Who really controls a building once it is operational? Chris Timmins of IOTech Systems explores the growing case for open, edge-led systems.

ABB could have a big role to play in Rolls-Royce's SMR deployment
The exploratory MoU comes as site-specific design advances for the first three planned UK units at Wylfa.

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.
