Speeding up the retro fit market
A dramatic speedup of installation time is achieved when compared to existing methods thanks to its innovative features which allow a 3 phase energy meter and its current transformers to be installed 5-10 times faster.
EM271 is part of the favoured EM270 family of quick fit energy meters. Similar to the EM270 it can measure up to two three phase loads or up to six single phase loads as well as creating a virtual meter to provide the sum of two three phase or six single phase loads.
Available as either Modbus + Pulse or Modbus + Modbus versions it provides fast and easy data transmission to PCs and PLCs for full load control, whilst all electrical parameters of the installation can be sent via the RS485 serial port for integration with BMS (Building Management Systems) and other standard acquisition-monitoring systems.
Carlo Gavazzi UK
01276 854110
{jathumbnail off}
Recommended Reading

Are building operators owning their systems – or just renting access?
Who really controls a building once it is operational? Chris Timmins of IOTech Systems explores the growing case for open, edge-led systems.

ABB could have a big role to play in Rolls-Royce's SMR deployment
The exploratory MoU comes as site-specific design advances for the first three planned UK units at Wylfa.

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.
