Lighting connection and control
flex7 Lighting connection and control products have been used in the recent £9.5m redevelopment of The Moy's End Stand at Peterborough United football stadium. The project includes a 3000sqm specialist education centre, linked to the stand.
The building was designed to reach a BREEAM excellent standard.
flex7 absence and daylight linking lighting control was installed throughout the building.
The consultant required a local emergency key switch with manual dimming and absence control in all offices, store rooms and WC areas. Only 1 switch drop was needed to control both dimming and emergency switching in any room where an fnc2000/E was used. Because the fnc2000E operates at protected extra low voltage, it does not need to be enclosed, or require an RCD to be compliant with the 17th edition wiring regulations.
flex7 products were chosen because of the flexibility of the product range and because the system is pre-fabricated, which ensured quick and easy installation on site.
Flex Connectors
020 8580 1066
Recommended Reading

Are building operators owning their systems – or just renting access?
Who really controls a building once it is operational? Chris Timmins of IOTech Systems explores the growing case for open, edge-led systems.

ABB could have a big role to play in Rolls-Royce's SMR deployment
The exploratory MoU comes as site-specific design advances for the first three planned UK units at Wylfa.

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.