The Hanham Hall development consists of 185 new homes located at South Gloucestershire. All new homes were constructed by Barratt Homes to comply with the Zero Carbon Homes definition.
Bsria, as an organisation, is ISO registered and is – in the main, – a test, instrument, and consultancy body for those in the construction and building services sector.
Bsria has completed assessments on Hanham Hall – including assessment of the performance of the properties in-use for energy and water consumption, construction quality, indoor environment and collected occupants’ opinions on their new homes.
Information on site demographics, levels of occupancy in the different properties, and occupants’ levels of satisfaction with their new homes was collected through occupant surveys. Post-occupancy energy and water consumption of all properties was monitored for three years, using wireless sensors recording data at five minute intervals.
Responses indicated the majority of residents were very satisfied with the performance of their properties. Overall, the respondents reported that their heating, electricity and water bills have been “much lower” compared to bills in their previous homes.
CO2 levels monitored in a sample of 10 properties indicated “good ventilation rates” for all the different design typologies. Thermal conditions within the sample properties showed “comfortable temperatures” maintained throughout the year with “no overheating”.
Peter Tse, business manager, (pictured) said: “Bsria was delighted for the opportunity to evaluate this flagship large-scale housing scheme set against the 2016 zero-carbon standard. This extensive evaluation – including occupant surveys, analysis of energy and water consumption, fabric assessment and review of indoor environment – will provide Barratt Homes with an insight into the performance of their new home designs and support a roadmap for future sustainable, energy efficient living.”
Recommended Reading

Are building operators owning their systems – or just renting access?
Who really controls a building once it is operational? Chris Timmins of IOTech Systems explores the growing case for open, edge-led systems.

EZO secures €150m debt facility for 3,000+ EV charge points
The financing will support more than 100MW of charging capacity across the UK and Ireland over the next three years.

ABB could have a big role to play in Rolls-Royce's SMR deployment
The exploratory MoU comes as site-specific design advances for the first three planned UK units at Wylfa.