Fire control panels central to detection system
Kentec fire control panels are central to a new fire detection system installed at the Wellcome Trust Centre for Human Genetics (WTCHG) - a research institute of the University of Oxford.
Kentec fire control panels are central to a new fire detection system installed at the Wellcome Trust Centre for Human Genetics (WTCHG) - a research institute of the University of Oxford.
When the university decided to replace the existing 10-year-old fire alarm and detection system, it was agreed with Oxfordshire based Pyrotec Services that the new system would be based around Hochiki's Enhanced Systems Protocol (ESP), Hochiki devices and Kentec control panels.
The University of Oxford Safety Office insists on open protocol systems, together with commonality of equipment. The use of Hochiki devices and Kentec control panels for all replacement and new systems has been the norm for the past 20 years.
The project involved installing a Kentec Syncro 12 loop, 96 zone Analogue Addressable control panel and two Syncro Focus Network LCD Repeater Panels using the existing cabling infrastructure. Approximately 1,000 devices were installed including nearly 500 ACB-E analogue multi-sensors, which incorporate a variable temperature heat element and a rate of rise heat element - both of which are controlled from the control panel, allowing either one or both elements to be active in making the fire decision.
Kentec
01322 222121
www.kentec.co.uk
Recommended Reading

Are building operators owning their systems – or just renting access?
Who really controls a building once it is operational? Chris Timmins of IOTech Systems explores the growing case for open, edge-led systems.

ABB could have a big role to play in Rolls-Royce's SMR deployment
The exploratory MoU comes as site-specific design advances for the first three planned UK units at Wylfa.

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.
