Cinematic success for 18th Edition
Cinematic success for 18th Edition
NICEIC and Elecsa’s live cinema event last week saw a broadcast on the new 18th Edition wiring regulations, beamed via satellite to 40 cinema screens simultaneously.
The 18th Edition seminar was broadcast from the Faraday Theatre, at The Royal Institution. Hosted by Darren Staniforth and Alan Wells, the talk focused on the changes included in the new regulations and what it will mean for electricians in their day-to-day work.
Several of the 40 cinema screens sold out in advance with Leeds, Sheffield, Birmingham, Southampton, Bristol and Leicester all recording more than 200 attendees at each location
NICEIC and Elecsa’s marketing director, Mark Smith, said: “The introduction of a new standard within the industry is an important time for every electrician.
“We wanted to do something unique, affordable and easily accessible to help contractors gain an improved insight into the forthcoming changes.
“It was a genuine world first and I am delighted that contractors came along and got involved. We hope they enjoyed the experience of learning and developing their knowledge in this different format.”
It also included a section on the history of electricity, and how Michael Faraday demonstrated his discoveries to the public way back in 1824.
“Since we were broadcasting from the iconic Faraday centre there was a natural link to provide viewers with some historical context about electricity, and the job contractors play in carrying on the work he started.”
The seminar was hosted by BBC TV star Ore Oduba and featured some key insights from industry experts including; Mark Coles, head of technical regulations at the IET, Robin Earl from Dehn, Simon Rawlinson from Siemens and David Garrett from Electrium.
The seminar went through all seven sections of the new book with discussions on the major changes in each section. This included discussions on the introduction of arc fault detection devices (AFDDs) and surge protection devices (SPDs) which have been included as recommendations to improve safety within certain electrical installations.
Recommended Reading

National Grid to use flexible demand to manage voltage in 100 LV zones

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.

Aegis starts construction of multi-energy commercial vehicle charging hub
Aegis expects the site to open in spring 2027, with 72 van bays and 30 truck bays at full build.
