Commissioning & Reliability

Petrol station refurbishment fast-tracked

Share:

Electrical contractor Active Connect is all geared up to install Marshall-Tufflex’s MT32 prefabricated modular wiring solution in BP company owned petrol stations around the country following a successful trial of the system at a site in Surrey.

As a BP approved electrical contractor, Active Connect was charged with designing and installing all power and data systems for the project and decided to trial Marshall-Tufflex’s MT32 modular power connection with a view to using it within future projects.

Each kit contained a pre-wired home run complete with distribution hub ready for on-site final connection to the distribution board and accessories. MT32 home run multi-core cables are prefabricated to suit the project specifications, which enabled quick and easy connection to pre-wired and assembled lighting and power points within the service station.


Marshall-Tufflex   
01424 856000
www.marshall-tufflex.com

Recommended Reading