News

Latest coverage on electrification infrastructure, grid connections, EV charging, and energy storage

All News Articles

Showing 4421-4430 of 8779 articles
Commissioning & Reliability

ESR urges main political parties to back home safety MOTs

An industry group that brings senior executives together to promote electrical safety has urged the main political parties to include provisions in their 2015 election manifestos to improve safety in the home by introducing and tightening up requirements for specific home safety checks.

2 October, 2014
Grid & Connections

Call for action

30 September, 2014
Commissioning & Reliability

Essential wiring regulations update to be launched by the IET in 2015

The Institution of Engineering and Technology (IET) has announced the IET Wiring Regulations BS 7671:2008 incorporating Amendment No. 3:2015 will be available in January 2015 in both print and digital formats.

25 September, 2014
Commissioning & Reliability

Labour market “dramatically improves” for building and engineering graduates, reports HECSU

The employment outcomes for graduates with first degrees in building and engineering were better year-on-year than graduates from all subjects - according to new research by the Higher Education Careers Services Unit (HECSU) published today (25 September 2014).

25 September, 2014
Commissioning & Reliability

JTL invests in Norfolk

Charitable company JTL has come to the rescue of apprentices in the Norwich area, after training services through EAGIT abruptly ended, following this organisation ceasing trading.

25 September, 2014
Commissioning & Reliability

Lighting up London’s Skyline

September marks the opening of The Leadenhall Building to visitors for the very first time. Referred to by many as the 'Cheesegrater’, the building is based in the heart of the City of London located right beside London’s ‘Walkie Talkie’. In 2012, Yorkshire based Winder Power, was contracted to be the exclusive transformer manufacturer and installer to power the land-mark building. Now, over two years later, Winder Power’s transformers will provide a substantial electricity supply to the ‘Cheesegrater’ in the form of two 10MVA transformers.

24 September, 2014
Commissioning & Reliability

IP68 fan

9 September, 2014
EV Charging Infrastructure

Guide to measuring sound levels in dB

9 September, 2014
Commissioning & Reliability

Box clever with environmentally friendly packaging

9 September, 2014
Commissioning & Reliability

Sheath-fault location

9 September, 2014
← PreviousPage 443 of 878Next →