Vertiv debuts Trinergy UPS aimed at AI-powered data centres
Vertiv has unveiled the Trinergy UPS to address the increasing power demands from AI and HPC applications globally.

Vertiv has unveiled two new solutions, the Trinergy UPS and PowerNexus, to address the increasing power demands from AI and HPC applications globally.
The design of the Trinergy extends modularity to all levels of the UPS architecture, which Vertiv says allows for significant space savings and reduced maintenance costs. This is enhanced when integrated with the Vertiv PowerBoard Switchgear as part of the Vertiv PowerNexus solution, further reducing installation times and costs.
The UPS, which is available in 1500, 2000, and 2500 kVA capacities, also claims to exceed Tier IV data centre uptime standards, with a projected uptime of 99.9999998%. Vertiv says that this minimal downtime will be critical for maintaining continuous operations in data-intensive sectors reliant on AI and HPC technologies.
Vertiv has also taken the opportunity to boast about the supposed energy efficiency of the Trinergy UPS, with it claiming to deliver up to 97.1% double conversion efficiency and 99% with Dynamic Online mode. This efficiency could reduce operating costs and minimise cooling system energy consumption, contributing to a lower total cost of ownership and faster payback periods.
Furthermore, the UPS supports dynamic grid services and can operate indefinitely on DC power even at full load.
Kyle Keeper, SVP of Power Management at Vertiv, noted, "Leveraging over 40 years of innovation, Vertiv Trinergy UPS offers the resilience essential for operations to become future-ready and to support AI loads. It delivers the flexibility required to adapt to various AI applications and is designed to integrate seamlessly with different prime and backup power sources, lithium-ion and nickel-zinc batteries, and alternative distributed energy sources, including fuel cells and long duration batteries (BESS)."
Recommended Reading

National Grid to use flexible demand to manage voltage in 100 LV zones

Aegis starts construction of multi-energy commercial vehicle charging hub
Aegis expects the site to open in spring 2027, with 72 van bays and 30 truck bays at full build.

£190m motorway charging scheme may not protect grid capacity for electric HGVs
The scheme includes future eHGV demand when sizing motorway grid connections, but the allocation rules don't ring-fence any of that capacity.
