Optimised production at copper mine
ABB has won an order for a three-year service agreement from Codelco (Corporacion Nacional del Cobre de Chile), the world’s largest copper producer. ABB will maintain and optimise the installed gearless mill drive system and related equipment at Codelco’s Andina copper mine in northern Chile.
ABB has won an order for a three-year service agreement from Codelco (Corporacion Nacional del Cobre de Chile), the world’s largest copper producer. ABB will maintain and optimise the installed gearless mill drive system and related equipment at Codelco’s Andina copper mine in northern Chile.
Codelco is the world’s largest copper producer, with an annual production capacity of 1.76 million tons of copper. With this enormous output, any unplanned plant downtime or equipment failure can result in high costs and production losses. Codelco decided to invest in a sustainable service plan by signing a three year term service agreement with ABB. This will keep production running at an optimal level and to reduce the risk of unscheduled downtime.
“Customers in all industries are looking at ways to reduce overall life cycle costs and make these costs more predictable, while continuing to improve equipment performance,” said Veli-Matti Reinikkala, head of ABB’s Process Automation division. “Our skilled service teams provide our customers with a long-term maintenance strategy that will keep production running efficiently well into the future.”
The agreement with Codelco includes life cycle management, scheduled maintenance services, as well as remote diagnostic services for a gearless mill drive (GMD) system supplied by ABB in 2010. Lifecycle management services will help keep the systems running smoothly at all times and maximise their productive life over time by providing upgrades, technical assistance, training and spare parts supply. Proactive preventative maintenance will minimise any potential equipment issues well before any production problems occur, and remote diagnostic services will enable service teams from anywhere in the world to quickly solve any issues via a secure remote connection.
Recommended Reading

Gridserve takes first UKPN flexible demand connection through an IDNO
UK Power Networks says the arrangement at Cobham will allow the EV charging hub to use available network capacity without overloading the network.

Enel X to aggregate Threefold commercial batteries for grid services
A five-year agreement will initially bring around 3.5MW of behind-the-meter battery capacity into Enel X’s virtual power plant.

Are building operators owning their systems – or just renting access?
Who really controls a building once it is operational? Chris Timmins of IOTech Systems explores the growing case for open, edge-led systems.
