Modular, scalable UPS solution
A leader in the development and manufacture of large integrated critical power systems - Socomec - has launched the latest addition to its range of energy efficient Green Power 2.0 modular UPS solutions at the Delphys Xtend GP. Designed specifically for large Data Centres, the Delphys Xtend GP provides a complete and scalable high performance system that can be built-up in power blocks of 200KW up to 1200KW.
The simple Cable In / Cable Out (I/O) architecture simplifies upstream and downstream switchboards. This flexibility allows more effective use of capital, as the system power can be matched to current demand, allowing investment in new power blocks to be made only when it is required.
As the system has been designed to allow the power blocks to be hot-swappable, if required, the load can be fully protected by on-line double conversion during system extension or maintenance. Manufactured in Europe, this prewired system has an individual Socomec switching system for each power block enabling easy and safe coupling and disconnection.
Andrew Wilkinson, Managing Director, Socomec UK explains: Delphys Xtend GP is an exciting addition to our range as it combines all the efficiency benefits of the Green Power 2.0 technology with the simplicity of I/O architecture and the scalability of a modular system.
We believe Delphys Xtend GP is going to bring many benefits to large datacentre operators both in terms of more effectively managing initial capital investment and reducing on-going operational costs.
Socomec
01285 86 33 00
www.socomec.com
Recommended Reading

Invinity warns UK investment could move overseas after Ofgem LDES selections
Invinity is reconsidering its UK investment plans after only one of the projects using its technology entered Ofgem’s provisional Window 1 portfolio.
.jpg%3F2026-08-24T08%253A44%253A01.948Z&w=3840&q=100)
UK Government launches £28m challenge for 100-hour energy storage
The Government is backing electrochemical and hydrogen storage technologies designed to supply energy over periods of at least 100 hours.

Parliamentary petition seeks to limit BESS installations to AI Growth Zones
A proposed BESS moratorium outside AI Growth Zones risks treating grid-scale storage as an adjunct to data centres, not critical infrastructure.
