Keeping energy transmission flowing
Temporary site cables can prevent costly interruptions to the power supply during upgrade work or repairs on energy networks, Nexans have designed leads specifically to connect equipment in a high-voltage (132kV) system on a temporary basis.
Due to the widespread introduction of renewable energy sources to the transmission network upgrade work is becoming more common whilst the requirement to maintain a constant supply is paramount.
Ideal as a bypass during construction or repair and servicing work Nexans temporary leads are supplied on special three chamber drums to make transportation and handling easier. Flexible silicone rubber outdoor terminations facilitate use in any position and thanks to their low weight, the terminations can be operated without additional support. Temporary leads have the same design as high voltage cables but with reduced insulation thickness, this facilitates a small bending radius making them easy to handle and install.
Nexans
01908 250840
www.nexans.co.uk
Recommended Reading

National Grid to use flexible demand to manage voltage in 100 LV zones
National Grid DSO is preparing to use flexible electrical demand to help manage voltage constraints on the low-voltage network.

Will commitment fees really solve the grid connection queue?
Equity Energies’ Elliott Meighan asks whether Ofgem’s new connection rules strike the right balance between readiness and financial strength.

Ofgem proposes £305m Sea Link allowance cut as harmonics issue remains unresolved
Ofgem has proposed cutting more than £305 million from NGET’s requested allowance for Sea Link, while raising concerns over a power quality issue.
