Heater boost switch for saving energy
Danlers heater boost switch, for the control of electric heating loads, automatically turns the load off after a selected time period has elapsed. There are 4 different time settings to choose from (15 minutes, 30 minutes, 1 hour and 2 hours).
Danlers heater boost switch, for the control of electric heating loads, automatically turns the load off after a selected time period has elapsed. There are 4 different time settings to choose from (15 minutes, 30 minutes, 1 hour and 2 hours).
Pressing the button selects each time lag choice in turn. The switch is manufactured by Danlers in the UK and is designed for use with immersion heaters, heated towel rails and other suitable electric heating loads. It is ideal for use in student or military accommodation, hotels etc. The control is also available as a Multi Selectable Time Lag switch for other types of loads.
Danlers
01249 443377
Recommended Reading

EZO secures €150m debt facility for 3,000+ EV charge points
The financing will support more than 100MW of charging capacity across the UK and Ireland over the next three years.

Aegis starts construction of multi-energy commercial vehicle charging hub
Aegis expects the site to open in spring 2027, with 72 van bays and 30 truck bays at full build.

£190m motorway charging scheme may not protect grid capacity for electric HGVs
The scheme includes future eHGV demand when sizing motorway grid connections, but the allocation rules don't ring-fence any of that capacity.
