AEI Cables welcomes new stance on sprinklers
Specialist supplier AEI Cables has welcomed the move by the Government to ensure sprinkler systems are mandatory in all new high-rise blocks over 11 metres tall when they come into force.
Specialist supplier AEI Cables has welcomed the move by the Government to ensure sprinkler systems are mandatory in all new high-rise blocks over 11 metres tall when they come into force.
The government announced an amendment to the statutory guidance to building safety regulations, known as Approved Document B, reducing the requirement for sprinkler systems from the current 30 metres to 11 metres.
Stuart Dover, general manager of AEI Cables said, “We believe sprinkler systems at this level will make a real difference to the safety of lives and property – as long as provision is made for the installation of approved cabling for these purposes.
“We look forward to working with the industry to make sure this can work in practice.”
The Fire Safety Bill, which was introduced to Parliament in April, will also empower fire and rescue services to take enforcement action and hold building owners to account if they do not comply with the law.
The Institution of Fire Prevention Officers (IFPO) is supporting the call by AEI Cables to ensure that reliable continuous power is provided for sprinkler systems.
The tried and tested generation of AEI Cables’ fire performance cabling ensure critical fire-safety circuits can continue to operate in the event of a fire from 30 minutes up to 120 minutes and often support systems which provide intelligence for the fire and rescue services.
Recommended Reading

ABB could have a big role to play in Rolls-Royce's SMR deployment
The exploratory MoU comes as site-specific design advances for the first three planned UK units at Wylfa.

National Grid to use flexible demand to manage voltage in 100 LV zones
National Grid DSO is preparing to use flexible electrical demand to help manage voltage constraints on the low-voltage network.

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.
