Centrifugal range of showerlight fans
The Centrifugal range of showerlight fans from Addvent is ideal for applications where longer ducting runs are required.
The AVC110IDTSLB and AVC110IDTSLC 100mm centrifugal extract is designed to extract moisture and odours from showers, bathrooms or toilets.
The kit for each fan includes two 3m lengths of ducting, the low voltage shower light diffuser, low voltage transformer and grilles. The fan also has an adjustable over run timer (1 to 20 minutes) - as standard.
The AVCPRO120CDFSLC is designed for larger bathrooms where two areas can be ventilated simultaneously by one fan. This fan differs from the smaller AVC110IDT range in its ability to ventilate two areas simultaneously. This is accomplished by the greater pressure created by this fan and by the products supplied with the model.
The kit for the fan includes 10m of 100mm ducting, one 100mm equal T piece, a low voltage shower light diffuser, a low voltage transformer and grilles.
The fans have a performance ranging between 110m3/hr to 180m3/hr which will cover ducting runs of up to 10m.
Each of the showerlight kits provide everything required for an effective and powerful way to ventilate a bathroom or any other area within a home.
All of the fans within the Addvent Showerlight range are designed to provide extraction levels that comply with Building Regulation (Document F) requirements.
Addvent
Tel +44 (0)117 938 6400
http://www.addvent.co.uk/
Recommended Reading

Is grid connections reform finally fixing Britain’s queue problem?
Eclipse Power’s Laura Henry asks whether Britain’s grid queue overhaul offers real progress for developers facing tighter rules and uncertain dates.

Electrical Review to examine Britain's growing reliance on subsea electricity cables
Electrical Review is set to host a virtual Briefing on November 25, where it'll explore whether the UK is prepared to rely on a growing subsea grid.

Grid readiness among UK's biggest energy infrastructure barriers, report finds
New research finds 59% of UK energy leaders identify grid readiness as a delivery barrier, while investment uncertainty is holding back projects.
