Utility control centre
Design verified - These are the key words from the new IEC assembly standards 61439-1 &2:2009. In the past much emphasis has been placed on obtaining an ASTA Certificate, which covers the short circuit withstand capability of an assembly.
What about the earthing system? Temperature rise? Impulse withstand? Insulation properties? The new standard addresses all these other requirements in a comprehensive way ensuring that all characteristics are treated with the respect they deserve, and every enclosure design must be verified against the appropriate test criteria. Rolla have approached the design of the new utility control centre with this in mind, and all verifications on the basic enclosure and busbar system have been done by testing (not by calculation, not by design rules) giving our customers and end users greater peace of mind. Rolla UCC - design verified.
For more information contact sales@rolla.co.uk www.rolla.co.uk
Recommended Reading

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.

Data centre pipeline exposes regional mismatch in electrical workforce
Planning analysis finds Wales has attracted 13% of recent data centre applications despite accounting for around 4% of Britain’s electrical workforce.

Is uncomfortable PPE putting compliance at risk?
Alsico's David Ward looks at how better PPE comfort, communication and worker engagement could improve compliance and workplace safety.
