New compact RCBO lighting control solutions save time and money
iLight control products by Cooper Controls, has announced the expansion of its line of RCBO (residual current breaker with overcurrent protection) source controllers with the release of new versions of its popular 12 channel lighting controllers. These new versions utilise more economical and compact versions of RCBO's that are currently being adopted in the general electrical contracting market, and for use in meeting the 17th Edition BS 7671 (IEE Wiring Regulations) for protecting lighting circuits running in walls.
The new enclosures are designed to accommodate the compact RCBO devices, which are just slightly wider than standard MCB's, whilst taking up as little space as possible. RCBO source controllers provide residual current protection of lighting circuits channel by channel, and are ideal for protection of wet location circuits such as bathrooms and exterior lighting.
"iLight has provided custom RCBO solutions to customers for years, but these additions will help bring down the cost of compliance to the UK 17th Edition Electrical Regulations," John Thorne, iLight UK sales director comments. "The new RCBO source controllers deliver a solution that is cost-effective, easier to install with their smaller enclosure size, and provides the flexibility to upgrade RCBO's on extra channels in the field at a later date."
For projects requiring a fully configurable solution, iLight will continue to supply custom solution racks that can be specified with RCBO parts installed alongside standard breakers solution.
To make specification and selection of RCBO solutions easier, a convenient order form is available on the website at: http://www.ilight.co.uk/support-downloads.htm
The iLight brand of lighting control products incorporates architectural lighting control with energy management and systems integration - all from one source. For more information, visit www.ilight.co.uk
+44 (0)1923 495495
Recommended Reading

ABB could have a big role to play in Rolls-Royce's SMR deployment
The exploratory MoU comes as site-specific design advances for the first three planned UK units at Wylfa.

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.

Data centre pipeline exposes regional mismatch in electrical workforce
Planning analysis finds Wales has attracted 13% of recent data centre applications despite accounting for around 4% of Britain’s electrical workforce.
