Plug and play
Merlin Power Management’s new ‘Plug & Play’ generator rental system enables an on-site generator installation to be up and running in less than 30 minutes.
Developed by Merlin’s technical team to make on-site installation quicker and easier, the cables, plugs and sockets are colour coded for foolproof installation. The ‘plug and play’ system enables installation between Merlin’s generators, the AMF panel and the customer’s load to be carried out using only five plug/socket connections.
Merlin Power Management
08700 623349
Recommended Reading

Europe's largest battery storage system goes live at Hams Hall
BW ESS says its 1,243MWh battery in North Warwickshire is now Europe's largest operational battery by energy storage capacity.

National Wealth Fund backs proposed £20m Invinity raise after UK investment warning
The battery manufacturer has earmarked £2 million for UK and US manufacturing, but has not specified how much will be invested in Britain.

Storage needs to move beyond the megawatt headline
The UK needs more battery storage, but megawatts alone don't tell the whole story. Location, duration and grid value must shape what gets built.
