Plug and play
Merlin Power Management’s new ‘Plug & Play’ generator rental system enables an on-site generator installation to be up and running in less than 30 minutes.
Developed by Merlin’s technical team to make on-site installation quicker and easier, the cables, plugs and sockets are colour coded for foolproof installation. The ‘plug and play’ system enables installation between Merlin’s generators, the AMF panel and the customer’s load to be carried out using only five plug/socket connections.
Merlin Power Management
08700 623349
Recommended Reading

Invinity warns UK investment could move overseas after Ofgem LDES selections
Invinity is reconsidering its UK investment plans after only one of the projects using its technology entered Ofgem’s provisional Window 1 portfolio.
.jpg%3F2026-08-24T08%253A44%253A01.948Z&w=3840&q=100)
UK Government launches £28m challenge for 100-hour energy storage
The Government is backing electrochemical and hydrogen storage technologies designed to supply energy over periods of at least 100 hours.

Parliamentary petition seeks to limit BESS installations to AI Growth Zones
A proposed BESS moratorium outside AI Growth Zones risks treating grid-scale storage as an adjunct to data centres, not critical infrastructure.
