Latest coverage on electrification infrastructure, grid connections, EV charging, and energy storage
After less than two years, The Schaeffler Group has completed the design and build of the world’s largest, most powerful test rig for large size bearings. The test rig is now fully operational and was officially opened at Schaeffler’s Schweinfurt plant in Germany in November.
ABB has signed an agreement with Inocean AS Norway, to set up an engineering services joint venture specialising in offshore wind integration projects.
This week, the women taking part in Wired for Success: ECA Women into Electrical Contracting will take a step forward in the journey towards becoming qualified domestic electrical installers as they start their on-site training in the homes of Londoners.