Latest coverage on electrification infrastructure, grid connections, EV charging, and energy storage
As both homeowners and commercial users become more style conscious, Schneider Electric has re launched Ultimate, an exceptional, high-design wiring accessories range to meet the evolving needs of the modern market.
Rittal will exhibited a range of its innovative products that can help to reduce costs and limit damage to the environment at this year’s Drives and Controls.
OKW has launched the all new Carrytec range of plastic enclosures for portable electronics equipment. These innovative enclosures have a modern contoured design and feature an integrated handle which is ergonomically designed for convenient carrying during operation.
Megaman’s GU10 AR111 15W and Candle 5W LED lamps have been used to great effect in the Fat Face chain of clothing and accessory stores throughout the UK. This is part of a roll-out programme to replace heat generating 75W halogen lamps and 25W incandescent candles respectively.
For installations needing duplicate equipment sets, for reasons of operational security or to meet peak loading demands, Finder has introduced a flexible multi-function priority change relay, providing convenient control of main and secondary systems. Suiting for example, pumping or refrigeration applications, the 72.42 relay has been designed to alternate the duty of two sets of equipment to ensure even wear over time.
As specialists in cabinet hardware FDB was excited by the possibilities of the Snap-Line range for use in fabricating flat pack enclosures, as illustrated by the videos available on FDBs Website and Youtube channel.
CP Electronics has supplied its Rapid Lighting Control System to the newly refurbished RNAS Culdrose site on the Lizard Peninsula, Cornwall. The system was specified by contractors MITIE Engineering Services because of its ability to provide a flexible system that allows the end user to easily configure the lighting controls to suit their own needs.
The S&C system will be designed to meet the UK’s strict compliance testing requirements—a prerequisite for wind farms to comply with the rigorous Grid Code interconnection standards. These standards enable effective operation of renewable energy plants with the grid and include complex interconnection specifications which call for continuous voltage regulation or reactive power control with very rapid response.
EMSc (UK), manufacturer of the Star range of energy saving solutions, has installed five of its Powerstar voltage optimisation units at the Department for Business Innovation and Skills (BIS), resulting in immediate savings in energy consumption and a substantial reduction in electricity costs and CO2 emissions.
Bicton EaRTH (Environmental & Renewable Technologies Hub, will be opened on the 11 May by Rt Hon Michael Gove MP, secretary of state for education.