News

Latest coverage on electrification infrastructure, grid connections, EV charging, and energy storage

All News Articles

Showing 5541-5550 of 8784 articles
Commissioning & Reliability

High-design wiring accessories

As both homeowners and commercial users become more style conscious, Schneider Electric has re launched Ultimate, an exceptional, high-design wiring accessories range to meet the evolving needs of the modern market. 


30 April, 2012
Commissioning & Reliability

Energy efficient climate control

Rittal will exhibited a range of its innovative products that can help to reduce costs and limit damage to the environment at this year’s Drives and Controls.

30 April, 2012
Commissioning & Reliability

New portable enclosures

OKW has launched the all new Carrytec range of plastic enclosures for portable electronics equipment. These innovative enclosures have a modern contoured design and feature an integrated handle which is ergonomically designed for convenient carrying during operation.

30 April, 2012
Commissioning & Reliability

LEDs at Fat Face

Megaman’s GU10 AR111 15W and Candle 5W LED lamps have been used to great effect in the Fat Face chain of clothing and accessory stores throughout the UK. This is part of a roll-out programme to replace heat generating 75W halogen lamps and 25W incandescent candles respectively.

30 April, 2012
Commissioning & Reliability

Priority change relay

For installations needing duplicate equipment sets, for reasons of operational security or to meet peak loading demands, Finder has introduced a flexible multi-function priority change relay, providing convenient control of main and secondary systems. Suiting for example, pumping or refrigeration applications, the 72.42 relay has been designed to alternate the duty of two sets of equipment to ensure even wear over time.

30 April, 2012
Commissioning & Reliability

Cabinet hardware specialist

As specialists in cabinet hardware FDB was excited by the possibilities of the Snap-Line range for use in fabricating flat pack enclosures, as illustrated by the videos available on FDBs Website and Youtube channel.

30 April, 2012
Commissioning & Reliability

Rapid lighting control

CP Electronics has supplied its Rapid Lighting Control System to the newly refurbished RNAS Culdrose site on the Lizard Peninsula, Cornwall. The system was specified by contractors MITIE Engineering Services because of its ability to provide a flexible system that allows the end user to easily configure the lighting controls to suit their own needs.

30 April, 2012
Commissioning & Reliability

S&C selected by EDF Energy Renewables to supply equipment for UK Grid compliance

The S&C system will be designed to meet the UK’s strict compliance testing requirements—a prerequisite for wind farms to comply with the rigorous Grid Code interconnection standards. These standards enable effective operation of renewable energy plants with the grid and include complex interconnection specifications which call for continuous voltage regulation or reactive power control with very rapid response.

30 April, 2012
Grid & Connections

BIS cuts energy costs and CO2 emissions

EMSc (UK), manufacturer of the Star range of energy saving solutions, has installed five of its Powerstar voltage optimisation units at the Department for Business Innovation and Skills (BIS), resulting in immediate savings in energy consumption and a substantial reduction in electricity costs and CO2 emissions.

30 April, 2012
Commissioning & Reliability

Purpose-built renewable training centre for Devon

Bicton EaRTH (Environmental & Renewable Technologies Hub, will be opened on the 11 May by Rt Hon Michael Gove MP, secretary of state for education.

30 April, 2012
← PreviousPage 555 of 879Next →