Latest coverage on electrification infrastructure, grid connections, EV charging, and energy storage
Partial discharges (PD) often occur due to impending insulation faults when electrical and acoustic pulses are sent out simultaneously. Omicorn's PDL 650 localises the acoustic signals using multiple sensors spread out over the transformer. The PDL software then calculates the fault location based on the time difference between the incoming signals.
Wago's Winsta Mini range of 2, 3, 4 and 5 pole plugs, sockets and distribution connectors is widely used for lighting and small power applications in buildings. The dependable Cage Clamp Clamp S system ensures reliable connection of conductors from 0.25mm2 to 1.5mm2 and carries a current rating of up to 400V, 16A.
Forrest has become the first firm to achieve certification for Green Deal by NICEIC.
The government has suggested the Electrical Safety Council (ESC) could spearhead a coordinated public awareness campaign on Part P for the Competent Person Schemes.
EMSc (UK) has announced the launch of its inaugural Manufacturing Sustainability Conference at the Magna Science Adventure Centre in Rotherham on Tuesday 18 September 2012.
Siemens has today announced Tronic, a Siemens subsea business based in Ulverston, will create 70 new roles at its Subsea Excellence Centre in Cumbria. This represents the biggest intake of employees and apprentices ever for the business.
Trumeter, a designer and manufacturer of counter and measuring products, has reached an exclusive agreement to launch the full ENTES product range in the UK and USA markets under the Trumeter brand name.
A water pumping station in Lancashire is saving over £19,000 per year on its energy costs following the replacement of its existing Heenan variable-speed drives with new drives from ABB.