News

Latest coverage on electrification infrastructure, grid connections, EV charging, and energy storage

All News Articles

Showing 3201-3210 of 5427 articles
Commissioning & Reliability

LEDs at Fat Face

Megaman’s GU10 AR111 15W and Candle 5W LED lamps have been used to great effect in the Fat Face chain of clothing and accessory stores throughout the UK. This is part of a roll-out programme to replace heat generating 75W halogen lamps and 25W incandescent candles respectively.

30 April, 2012
Commissioning & Reliability

Priority change relay

For installations needing duplicate equipment sets, for reasons of operational security or to meet peak loading demands, Finder has introduced a flexible multi-function priority change relay, providing convenient control of main and secondary systems. Suiting for example, pumping or refrigeration applications, the 72.42 relay has been designed to alternate the duty of two sets of equipment to ensure even wear over time.

30 April, 2012
Commissioning & Reliability

Cabinet hardware specialist

As specialists in cabinet hardware FDB was excited by the possibilities of the Snap-Line range for use in fabricating flat pack enclosures, as illustrated by the videos available on FDBs Website and Youtube channel.

30 April, 2012
Commissioning & Reliability

Rapid lighting control

CP Electronics has supplied its Rapid Lighting Control System to the newly refurbished RNAS Culdrose site on the Lizard Peninsula, Cornwall. The system was specified by contractors MITIE Engineering Services because of its ability to provide a flexible system that allows the end user to easily configure the lighting controls to suit their own needs.

30 April, 2012
Commissioning & Reliability

S&C selected by EDF Energy Renewables to supply equipment for UK Grid compliance

The S&C system will be designed to meet the UK’s strict compliance testing requirements—a prerequisite for wind farms to comply with the rigorous Grid Code interconnection standards. These standards enable effective operation of renewable energy plants with the grid and include complex interconnection specifications which call for continuous voltage regulation or reactive power control with very rapid response.

30 April, 2012
Commissioning & Reliability

Purpose-built renewable training centre for Devon

Bicton EaRTH (Environmental & Renewable Technologies Hub, will be opened on the 11 May by Rt Hon Michael Gove MP, secretary of state for education.

30 April, 2012
Commissioning & Reliability

Fire safety industry alert on standard revision

The fire protection industry should be fully aware of the implications of two new revised parts of a key European standard being published soon, says global testing expert Exova Warringtonfire.

30 April, 2012
Commissioning & Reliability

Safely lock out the electrical source

23 April, 2012
Commissioning & Reliability

Calling all engineers!

23 April, 2012
Commissioning & Reliability

Flexible solution proves ideal for council offices

Modular Wiring Systems, a subsidiary of electrical cable manufacturer Tratos, has designed, manufactured and supplied modular power and lighting distribution systems for Birmingham City Council’s new flagship workplace.



20 April, 2012
← PreviousPage 321 of 543Next →